LOW KAH YIENGINEER & SYSTEMS THINKER
Appearance
Contact

WORK, MODELS & NOTES

Find an idea.
Follow the evidence.

24 matching pages.

Profile · Leadership

About Low Kah Yi

Engineering leadership, experience, education and the professional profile.

Explore →
Professional experience · Commissioning / Acceptance testing

Accept it before you depend on it.

Replacing more than 30 end-of-life analyzers through tender, factory testing, installation and handover.

Explore →
Interactive lab · Alarm management / Operations

Alarm Flood

Play the operator through an alarm flood, then see how priorities, delays and suppression change the same upset.

Explore →
Engineering note · Capacity / Thermal systems

Capacity margin determines what happens after restoration.

Shortening a restart cannot remove a steady cooling deficit. Compare restored capacity, requested load and the heat left to remove.

Explore →
Engineering note · Change / Maintenance

Changing a system that cannot stop.

Planned work removes redundancy before anything fails. Decide the stop points, the recoverable state and the evidence before the window opens.

Explore →
Engineering essay · Virtualization / Recovery

Consolidate the hardware. Plan the recovery.

Moving control applications onto shared servers saves hardware and concentrates risk. The recovery has to be planned with it.

Explore →
Interactive lab · Feedback / Identification

Control Room

Tune a PID controller, compare responses and test uncertainty with reproducible studies.

Explore →
Interactive lab · Capacity / Thermal systems

Cooling Lab

Change heat load and cooling capacity, then inspect the thermal response and its limits.

Explore →
Engineering note · Redundancy / Maintainability

Count redundancy by what it survives.

N+1 and 2N describe how much equipment is installed. The useful question is which events the arrangement can absorb, including the ones that arrive together.

Explore →
Engineering note · Dependencies / Reliability

Dependencies are part of the design.

Two supply paths can share one cooling dependency. Trace the relationships before counting the equipment.

Explore →
Profile · Principles / Reliability / Recovery / Change

Engineering principles

The principle behind each case study and note, linked to the work it comes from.

Explore →
Engineering note · Alarm management / Operations

Every alarm should ask for an action.

An alarm flood buries the cause of an upset. Priorities, delays and suppression each fix a different part of the problem, and none changes the process.

Explore →
Browse the writing archive →